Volume 75: James and William Macarthur business correspondence, 1823-1877: No. 307

You are here

Transcription

[Page 307]

Boston Skirbeck Iron Works,   November 1863

Sir William Macarthur

To Tuxford & Sons
Engineers, Iron Founders &c

Quarter     Terms Net cash

1863         Invoice No 3
Novemr 20
 

To 3 12 feet lengths of 2½ inch Shafting
turned up and parallelized, so that
the pulleys can be shifted along its
length, the shafting fitted with couplings
bored out and turned up;
and 1 wall box with carriage &
3 hanging carriages all fitted with
brasses bored out complete
for fixing
  20.14. 0
1 24 inch pulley 7 inches wide for
receiving motion from the Engine
4 20 inch   do    6 inches wide to the
Shafting for driving Machinery,
the pulleys turned up, bored
out, Keysealed and fitted on Shafts
   5.10. 0
Packing & casing Shafting         6. 0
Packing & casing Pulleys        12. 0
Carriage of Shafting & Pulleys
    to the London Docks
       12. 6
    27.14. 6
Less 5 per cent discount for cash      1. 7. 9
  £ 26. 6. 9

 

This page has its status set to Ready for review and is no longer transcribable.