This page has already been transcribed. You can find new pages to transcribe here.

Transcription

[Page 1]

[indecipherable]

he has done as much as Could have been done on the Lede Bank line   The  [Ford?]  Cutting has prevented him
he has done the same on the East Fen Line

he has [given?] within a Shilling a [indecipherable] of the Price he Receives

The West Fen has causd a Loss of 10-15 per  Cent from the [west?] of a [Trench?] under the new Cut to take off the water which is now laid down but has neglected till  May when 15 men had Left him for want of work
he has now  on the whole of the [works?] 450

 East Fen Line -----225
Lede Bank
E Lede Bank   -----

1  Concerning the Embankment of the Witham from the Coldwater drain to the Witham 
See p 25     Were they not required to Embank
The Wittens &c make & Embank a Catch for water [indecipherable] in

New drain instead of the Pike drain [indecipherable]

Current Status: 
Completed