Primary tabs
Transcription
[Page 1]
[indecipherable]
he has done as much as Could have been done on the Lede Bank line The [Ford?] Cutting has prevented him
he has done the same on the East Fen Line
he has [given?] within a Shilling a [indecipherable] of the Price he Receives
The West Fen has causd a Loss of 10-15 per Cent from the [west?] of a [Trench?] under the new Cut to take off the water which is now laid down but has neglected till May when 15 men had Left him for want of work
he has now on the whole of the [works?] 450
East Fen Line -----225
Lede Bank
E Lede Bank -----
1 Concerning the Embankment of the Witham from the Coldwater drain to the Witham
See p 25 Were they not required to Embank
The Wittens &c make & Embank a Catch for water [indecipherable] in
New drain instead of the Pike drain [indecipherable]